Home » Categories » Multiple Categories |
What are the power requirements for the MVI69 CompactLogix modules? |
Article Number: 137 | Rating: Unrated | Last Updated: Thu, Sep 3, 2015 at 2:54 PM |
MVI69 modules require 800ma @ 5 volts and have a Distance Rating of 2 (slots from a power supply) MVI69E modules require 500ma @5 volts and have a Distance Rating of 4 MVI69L modules require 450ma @ 5 volts and have a Distance Rating of 4 The 24v requirements for all of these MVI modules is negligible |
Attachments (0)
![]()
There are no attachments for this article.
|
Comments
![]()
There are no comments for this article. Be the first to post a comment.
|
What causes a conditional command to be issued?
Viewed 1 times since Tue, Nov 28, 2006
Do ProSoft AFC Flow Computer solutions support "ASME MFc-6M", "API-11" and/or "API-12" calculation standards for measuring lubricating oils?
Viewed 1 times since Tue, Jul 8, 2008
Using AFC modules with corrected (net) flow as in input
Viewed 1 times since Fri, Sep 19, 2014
How do I setup the DNPSNET module to perform unsolicited messaging?
Viewed 1 times since Tue, Nov 28, 2006
For what purposes would I use the Multiple Meter Streams options on my MVIxx-AFC Flow Computer?
Viewed 1 times since Wed, Mar 19, 2008
Can the ProSoft DNPSNET solutions support multiple masters (clients)?
Viewed 1 times since Tue, Nov 28, 2006
What does a -36 modbus error code indicate?
Viewed 1 times since Thu, Aug 20, 2015
The Wallclock in my ProSoft MVIxx-AFC module seems to be showing Greenwich Mean Time (GMT or Universal Time) instead of Local Time. How do I get it to use Local Time?
Viewed 1 times since Wed, Dec 3, 2008
What are the differences between the PROFIBUS Master MVI69-PDPMV1 and PS69-DPM modules?
Viewed 1 times since Tue, Mar 24, 2009
How to avoid slow data updates on a Modbus network with an MVI56(E)-MCM or MVI69-MCM when some Slaves are either not on-line or not functioning correctly?
Viewed 1 times since Wed, Mar 19, 2008
|