• English
  • 中文
  • Français
  • Deutsch
  • Español
Contact Us
Home
Email
Follow Prosoft Technology on Twitter
Follow Prosoft Technology on Facebook
Follow Prosoft Technology on LinkedIn
Follow Prosoft Technology on YouTube
    • PROFINET Controller Module for ControlLogix®
    • EtherNet/IP™ to DH+ Gateway
    • Two-Port Building Automation Gateway
  • Solutions
    • Amusement
    • Automated Material Handling
    • Automotive
    • IIoT Solutions
    • Mining and Metals
    • Modernization
    • Oil and Gas Solutions
    • Secure Remote Connectivity
    • Water & Wastewater
  • Products
    • Remote Access
    • Rockwell Automation In-chassis
    • Gateways
    • Industrial Wireless
    • ProSoft Software
  • Services & Support
    • Knowledge Base
    • Regional Technical Support
    • Legacy Products
    • Training
    • Return Material Instructions
    • Literature
  • News & Events
    • ProSoft Insights (Blog)
    • Podcast
    • Knowledge Base / Gateways / AN-X / AN-X2 / AN-X / Data Highway Plus

      What are common things that prevent reliable DH+ communications on the AN-X(2)-AB-DHRIO gateway running the DH+ Bridge FW?

      Search KB

      Categories

      • Gateways
        • ProLinx 4000/5000
        • PLX8x Gateways
        • QuickServer
        • PLX31/32 Gateways
        • PLX35 Gateways
        • AN-X / AN-X2
          • AN-X
            • RIO Scanner
            • Data Highway Plus
            • Modicon S908
          • AN-X(2)-GENI
          • AN-X-AMX
          • AN-X2-AB-DHRIO
        • PLX51 Gateways
      • Rockwell In-chassis
      • Schneider In-chassis
      • Wireless
      • Accessories
      • Protocols
      • Software
      • Legacy Products
      • Certifications
      • Technical Support
      • Miscellaneous
      • Friday October 14 2016

      If the NS or NET LED is not solid green then check the recommendations below:

      1) For networks running at 57k6 or 115k2 bauds it is necessary to have 150 ohm resistors on each end of the network (for 230k4 use 82 ohm resistors)
      2) Ensure that at least 10' or 3 meters of cable is used between gateway and any surrounding nodes
      3) Ensure that the outer braided shield has been grounded in one place to reduce noise

      Attachments

      Related Products


Solutions

  • Amusement
  • Automated Material Handling
  • Automotive
  • IIoT Solutions
  • Mining and Metals
  • Modernization
  • Oil and Gas Solutions
  • Secure Remote Connectivity
  • Water & Wastewater

Products

  • Remote Access
  • Rockwell Automation In-chassis
  • Gateways
  • Industrial Wireless
  • ProSoft Software

Services & Support

  • Knowledge Base
  • Regional Technical Support
  • Legacy Products
  • Training